On-Premises / Hybrid

Develop what exists. Plan connections carefully.

We modernise existing environments and connect them selectively to cloud platforms. Your applications and data are the starting point: What must remain, what can change and which connection needs dependable operations? This produces manageable steps for automation, containers and hybrid architecture.

Request an architecture discussion

Assess the existing environment and its dependencies

We record applications, virtualisation or container operations, data storage and necessary network services. Versions, support limits and available capacity are connected to actual dependencies and responsibilities. This reveals technical risks and operational bottlenecks. A modernisation concept distinguishes foundations that remain viable from components that need replacing or decoupling. It accounts for ongoing operation and your team's capabilities. Complete relocation is a possible decision, rather than a predetermined outcome.

Use automation and containers selectively

Reproducible configuration and standardised deployments can also make a major difference in your own data centre. We examine which workflows regularly require manual intervention and where a versioned delivery path creates stability and transparency. Containers can encapsulate runtime dependencies better, but do not take over data backup or platform operation. A self-managed Kubernetes approach requires ownership of the control plane, network connectivity and storage, among other tasks. These responsibilities are expressly considered in selection and handover.

Design hybrid connections with clear boundaries

A hybrid architecture distributes responsibility and failure sources across environments. We describe which data is needed synchronously, which processing can be asynchronous and where a service must continue working independently. Identities, routing, DNS and access controls are tested as one connected user journey. Particular attention goes to an interrupted or slow connection: Which function fails, which data remains available and who can narrow down the cause? These answers determine technical coupling.

Carry out modernisation in manageable steps

An existing platform can change gradually: first a reliable deployment path, then a decoupled interface or replacement of a bounded infrastructure component. Each step needs a benefit, tested transition and viable target state. Interim architectures are documented with their purpose and limits. This avoids temporary connections becoming permanent without ownership. Sequencing follows dependencies, operational risk and available change windows.

An operating model for both sides and the transition

We clarify who looks after the data centre, cloud resources and their connection. Access, changes and escalations must remain understandable during cross-boundary problems. An incident must not stall merely because its cause cannot yet be attributed to one side. The operating concept brings monitoring signals and diagnostic paths together. It identifies necessary contacts and permissions and defines how changes are coordinated. The connection is treated as an operational component in its own right.

Test data and recovery in context

For a hybrid system, backing up only one part can produce an incomplete state. We consider data consistency, interface states and the sequence in which components must be restored. Keys and necessary identity services also belong in this assessment. An appropriate restore test checks application access and whether the data is usable for the business. It reveals whether operations can restart without the other environment. These findings inform recovery objectives and further decoupling.

Take the task forward with purpose

Migration & Modernisation

Move applications and data in tested steps. Dependencies, cutover and recovery determine the plan.

Plan your migration path

Infrastructure as Code & CI/CD

Version infrastructure and releases and execute them under control. With clear permissions, secure state and a maintainable path for your team.

Develop automation

Discuss your project

Describe your application, environment and desired result. From this, we define a technical investigation or an actionable first step.

Discuss your plans

What should remain, and what must change?

We consider the existing environment and planned change together. A specific operational bottleneck, a component nearing end of life or a new cloud connection can be the starting point.